Skip to main content

About Us

May contain: animal, bird, vulture, and beak

Here at the Clifton Sanitation District we inspect, maintain, and repair and/or upgrade more than 75 miles of wastewater collection and conveyance piping throughout the Clifton area. The wastewater collected by this system is directed to our 2.5 million gallons per day wastewater treatment facility where contaminates are removed though a multistage mechanical and biological process to allow for safe discharge to the Colorado River.

Treated water from our facility will be used downstream for recreation, such as boating or fishing, intake to drinking water facilities, and habitat for fish and other aquatic organisms. Water that is not returned to the Colorado River is used at our facility to water lawns and agricultural crops. Through the treatment process a byproduct called biosolids is generated, this is used as a soil amendment on District properties.